| Status of the CLIC Study on Magnet Stabilization and Time-Dependent Luminosity | 446 | ||
| R.W. Assmann, W. Coosemans, G. Guignard, N. Leros, S. Redaelli, D. Schulte, I. Wilson, F. Zimmermann, CERN, Geneva | |||
| PAPER | |||
| Static Beam-Based Alignment of the RF Structures in the CLIC Main Linac | 461 | ||
| N. Leros, D. Schulte, CERN, Geneva | |||
| PAPER | |||
| Feedback Response in the CLIC Main Linac to Transverse and Longitudinal Dynamic Imperfections | 464 | ||
| N. Leros, D. Schulte, CERN, Geneva | |||
| PAPER | |||
| CLIC Simulations from the Start of the Linac to the Interaction Point | 500 | ||
| D. Schulte, R.W. Assmann, T.E. D'Amico, G. Guignard, N. Leros, S. Redaelli, T. Risselada, F. Zimmermann, CERN, Geneva; G.A. Blair, RHUL, Egham | |||
| PAPER | |||