| Accelerator Challenges of Proposed Radioactive Beam Facilities | 99 | ||
| O. Boine-Frankenheim, GSI, Darmstadt | |||
| PAPER | |||
| Conceptual Design of a Facility for Internal Target Experiments with Antiprotons up to 15 GeV/c | 575 | ||
| B. Franzke, K. Beckert, P. Beller, O. Boine-Frankenheim, A. Dolinskii, F. Nolden, M. Steck, GSI, Darmstadt | |||
| PAPER | |||
| Double Synchrotron Complex SIS100/200 for a New Research Facility at GSI | 626 | ||
| P. Spiller, K. Blasche, O. Boine-Frankenheim, B. Franczak, P. Hülsmann, G. Moritz, H. Reich-Sprenger, P. Schütt, GSI, Darmstadt | |||
| PAPER | |||
| Driving the Electron-Cloud Instability by an Electron Cooler | 1559 | ||
| G. Rumolo, F. Zimmermann, CERN, Geneva; O. Boine-Frankenheim, I. Hofmann, GSI, Darmstadt | |||
| PAPER | |||
| Measurement and Calculation of U28+ Beam Lifetime in SIS | 2547 | ||
| O. Boine-Frankenheim, A. Krämer, E. Mustafin, H. Reich-Sprenger, P. Spiller, GSI, Darmstadt | |||
| PAPER | |||