Accelerator Challenges of Proposed Radioactive Beam Facilities       99
  O. Boine-Frankenheim, GSI, Darmstadt      
  PAPER        
       
  Conceptual Design of a Facility for Internal Target Experiments with Antiprotons up to 15 GeV/c       575
  B. Franzke, K. Beckert, P. Beller, O. Boine-Frankenheim, A. Dolinskii, F. Nolden, M. Steck, GSI, Darmstadt      
  PAPER        
       
  Double Synchrotron Complex SIS100/200 for a New Research Facility at GSI       626
  P. Spiller, K. Blasche, O. Boine-Frankenheim, B. Franczak, P. Hülsmann, G. Moritz, H. Reich-Sprenger, P. Schütt, GSI, Darmstadt      
  PAPER        
       
  Driving the Electron-Cloud Instability by an Electron Cooler       1559
  G. Rumolo, F. Zimmermann, CERN, Geneva; O. Boine-Frankenheim, I. Hofmann, GSI, Darmstadt      
  PAPER        
       
  Measurement and Calculation of U28+ Beam Lifetime in SIS       2547
  O. Boine-Frankenheim, A. Krämer, E. Mustafin, H. Reich-Sprenger, P. Spiller, GSI, Darmstadt      
  PAPER