| Background Simulation for the CLIC Beam Delivery System with Geant | 449 | ||
| G.A. Blair, RHUL, Egham; H. Burkhardt, CERN, Geneva; H.-J. Schreiber, DESY, Zeuthen | |||
| PAPER | |||
| Comparison of Different Tracking Codes for Beam Delivery Systems of Linear Colliders | 488 | ||
| S. Redaelli, R.W. Assmann, H. Burkhardt, D. Schulte, F. Zimmermann, CERN, Geneva; N. Walker, DESY, Hamburg; G.A. Blair, RHUL, Egham; Y. Nosochkov, T.O. Raubenheimer, A. Seryi, P. Tenenbaum, SLAC, Stanford | |||
| PAPER | |||
| CLIC Simulations from the Start of the Linac to the Interaction Point | 500 | ||
| D. Schulte, R.W. Assmann, T.E. D'Amico, G. Guignard, N. Leros, S. Redaelli, T. Risselada, F. Zimmermann, CERN, Geneva; G.A. Blair, RHUL, Egham | |||
| PAPER | |||
| Design Status of the CLIC Beam Delivery System | 530 | ||
| F. Zimmermann, M. Aleksa, R.W. Assmann, H. Burkhardt, S. Redaelli, T. Risselada, S. Russenschuck, D. Schulte, CERN, Geneva; A. Faus-Golfe, IFIC, Valencia; G.A. Blair, RHUL, Egham | |||
| PAPER | |||
| R&D Towards a Laser Based Beam Size Monitor for the Future Linear Collider | 1912 | ||
| T. Kamps, G.A. Blair, F. Poirier, RHUL, Egham; H. Lewin, S. Schreiber, N. Walker, K. Wittenburg, DESY, Hamburg | |||
| PAPER | |||