| Paper | 
        Title | 
        Page | 
    
    
        | CT08 | 
        Adaptive Optics for the LEP 2 Synchrotron Light Monitors
         | 
        77 | 
    
    
        |   | 
        
                - G. Burtin, R.J. Colchester, G. Ferioli, J.J. Gras, R. Jung, J.M. Vouillot
 
                       CERN, Geneva, Switzerland 
          | 
          | 
    
        
            |   | 
            
            The image obtained with the LEP synchrotron
            radiation telescopes deteriorates, giving multiple and
            deformed images, when the beam energy goes beyond
            80 GeV at beam currents above 2 mA. This problem is
            due to the deformation of the light extracting beryllium
            mirror, by as little as 1 mm, and had been predicted at
            the design stage. To overcome this problem, several
            changes together with an adaptive optics set-up have
            been introduced. These essentially consist of a
            cylindrically deformable mirror to compensate the
            cylindrical deformation of the beryllium mirror and a
            movable detector to compensate the spherical
            deformation. Both components are continuously
            adjusted as a function of beam current and energy.
             | 
              | 
        
    
        | CT11 | 
        The OTR Screen Betatron Matching Monitor of the CERN SPS
         | 
        90 | 
    
    
        |   | 
        
                - C. Bovet, R.J. Colchester, G. Ferioli, J.J. Gras, R. Jung, J.M. Vouillot
 
                       CERN, Geneva, Switzerland 
          | 
          | 
    
        
            |   | 
            
            In order to satisfy the stringent emittance
            requirements of LHC, betatron matching monitors,
            based on multiturn beam profile measurements, have
            been proposed for the SPS and LHC. A test monitor
            has been installed for evaluation in the CERN SPS first
            in 1996 and improved in 1997. It is based on an OTR
            screen and a fast beam profile acquisition system. It
            has been used with proton beams to assess the quality
            of the betatron matching from the PS to the SPS in
            1998. Experience and results are presented.
             | 
              |