Paper | Title | Other Keywords | Page |
---|---|---|---|
TUPD37 | Synchrotron Radiation Monitor and Mirror at SSRF | feedback, synchrotron, radiation, electron | 381 |
|
|||
SR monitor for the measurements of beam profile, sizes, and bunch length has been designed and constructed at the Shanghai synchrotron radiation Facility (SSRF). A water-cooled beryllium mirror is installed to extract the visible SR. This beryllium mirror was designed via thermal analysis based on ANSYS. The extracted visible SR is relayed to dark room by three mirrors. The measurement system includes, imaging system, SR interferometers (SRI), streak camera and fast-gated camera etc are set in the dark room. Both the horizontal and the vertical beam sizes are monitored by SRI, and bunch length and temporal profile of the beam are measured by streak camera. The existed system suffers with dynamic problem for beam physics studies. The commissioning of synchrotron radiation monitor system has been performed in SSRF since December, 2007. The results obtained at SSRF will be presented. |
|||
TUPD43 | Synchrotron Radiation Monitor for Bunch-Resolved Beam Energy Measurements at FLASH | synchrotron, radiation, electron, dipole | 399 |
|
|||
A synchrotron radiation monitor (SRM) based on a multi-anode photomultiplier tube (PMT) has been installed in the first magnetic bunch compressor chicane at the Free-electron LASer in Hamburg (FLASH). The synchrotron radiation emitted in the third dipole of the magnetic chicane is imaged by a telescope onto two anodes of the PMT. In this way the horizontal beam position of the electron bunches is recorded which corresponds to the beam energy as the beam position is governed by the beam energy in the dispersive section of the magnetic chicane. The fast PMT signals are digitized by analog -to-digital converters (ADC) which enables bunch-resolved beam energy measurement within the trains of the up to 800 bunches generated by the superconducting linear accelerator of FLASH. In this paper we describe the experimental setup of the SRM and present first commissioning results for various accelerator settings. |