A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   R   S   T   U   V   W   X   Y   Z  

Scheidt, K.B.

Paper Title Page
MOPD05 Installation and Commissioning of a Complete Upgrade of the BPM System for the ESRF Storage Ring 50
 
  • K.B. Scheidt, F. Epaud
    ESRF, Grenoble
 
 

The ESRF Storage Ring has, in the period of the last 3 winter months, been fully equiped with new electronics for its BPM system while causing a minimum disturbance to its large community of X-ray beam-line users. The Libera-Brillance is now actively doing the treatment of the weak RF signals on all of the 224 BPM stations, and has replaced the old RF-Multiplexing system that had served reliably for nearly 17 years. This paper will describe the precautions that had been taken to make the whole transition as smooth and fluid as possible, with regards to both the reliability for the SR operation and the positional stability of the X-ray beams for the users of more than 40 beamlines. Information will be given on the structure of the network and computer control, based on the Tango distributed control system and its associated device-servers and tools. Results obtained will be presented to demonstrate the strongly improved performance and functionality in every field of application, and that will make this new BPM system the key component in the near future’s upgraded orbit stabilization system.