Paper | Title | Page |
---|---|---|
WEOB01 | Beam Diagnostics and RF Systems Requirements for the SwissFEL Facility | 427 |
|
||
In this paper, we describe four very different operating modes of the SwissFEL facility, the requirements of the challenging beam diagnostics and ultra-stable RF systems needed for two special operating modes with 10 pC, and the present status of developing beam diagnostics and RF systems for the PSI 250 MeV injector test facility, which is under construction. |
||
|