A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   R   S   T   U   V   W   Y    

Calvo-Giraldo, E.

Paper Title Page
PT08 The LHC Orbit and Trajectory System 187
 
  • E. Calvo-Giraldo, C. Boccard, D. Cocq, L. Jensen, R. Jones, J.J. Savioz
    CERN, Geneva, Switzerland
  • D. Bishop, G. Waters
    TRIUMF, Vancouver, Canada
 
  This paper describes the definitive acquisition system selected for the measurement of the closed orbit and trajectory in the CERN-LHC and its transfer lines. The system is based on a Wide Band Time Normaliser (WBTN) followed by a 10-bit ADC and a Digital Acquisition Board (DAB), the latter developed by TRIUMF, Canada. The complete chain works at 40 MHz, so allowing the position of each bunch to be measured individually. In order to avoid radiation problems with the electronics in the LHC tunnel, all the digital systems will be kept on the surface and linked to the analogue front-ends via a single mode fibre-optic connection. Slow control via a WorldFIP fieldbus will be used in the tunnel for setting the various operational modes of the system and will also be used to check power supply statuses. As well as describing the hardware involved, some results will be shown from a complete prototype system installed on four pick-ups in the CERN-SPS using the full LHC topology.