A   B   C   D   E   F   G   H   J   K   L   M   N   O   P   R   S   T   U   V   W   Y   Z    

Singh, O.

Paper Title Page
PM08 Advanced Photon Source RF Beam Position Monitor System Upgrade Design and Commissioning 180
 
  • R. Lill, G. Decker, O. Singh
    ANL, Argonne National Laboratory, Argonne, Illinois, USA
 
  This paper describes the Advanced Photon Source (APS) storage ring mono-pulse rf beam position monitor (BPM) system upgrade. The present rf BPM system requires a large dead time of 400 ns between the measured bunch and upstream bunch. The bunch pattern is also constrained by the required target cluster of six bunches of 7 mA minimum necessary to operate the receiver near the top end of the dynamic range. The upgrade design objectives involve resolving bunches spaced as closely as 100 ns. These design objectives require us to reduce receiver front-end losses and reflections. An improved trigger scheme that minimizes systematic errors is also required. The upgrade is in the final phases of installation and commissioning at this time. The latest experimental and commissioning data and results will be presented.