Paper |
Title |
Page |
THPAM1R2 |
Sustaining Competences for Electron Cooling at HESR |
37 |
|
- K. Aulenbacher, Th. Beiser, J. Dietrich, W. Klag
HIM, Mainz, Germany
|
|
|
The HESR storage ring will be operated with a high intensity antiproton beam to serve the PANDA experiment. Due to several reasons its completion is presently postponed which causes the issue how to keep the competences required to operate the electron cooler. We will present mitigation plans that will enable Helmholtz-Institut Mainz to pursue its goals even if the present situation would last for a long time.
|
|
|
Slides THPAM1R2 [8.088 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-COOL2023-THPAM1R2
|
|
About • |
Received ※ 22 November 2023 — Revised ※ 27 November 2023 — Accepted ※ 04 December 2023 — Issued ※ 02 December 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|