JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


BiBTeX citation export for S302: Recommissioning of the CERN AD Stochastic Cooling System in 2021 after Long Shutdown 2

@inproceedings{hoefle:cool2021-s302,
  author       = {W. Höfle and C. Carli and F. Caspers and B. Dupuy and D. Gamba and R. Louwerse and V.R. Myklebust and J.C. Oliveira and L. Ponce and S.F. Rey and L. Thorndahl},
% author       = {W. Höfle and C. Carli and F. Caspers and B. Dupuy and D. Gamba and R. Louwerse and others},
% author       = {W. Höfle and others},
  title        = {{Recommissioning of the CERN AD Stochastic Cooling System in 2021 after Long Shutdown 2}},
  booktitle    = {Proc. COOL'21},
  pages        = {20--25},
  eid          = {S302},
  language     = {english},
  keywords     = {kicker, pick-up, operation, MMI, proton},
  venue        = {Novosibirsk, Russia},
  series       = {Workshop on Beam Cooling and Related Topics},
  number       = {13},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {11},
  year         = {2021},
  issn         = {2226-0374},
  isbn         = {978-3-95450-243-1},
  doi          = {10.18429/JACoW-COOL2021-S302},
  url          = {https://jacow.org/cool2021/papers/s302.pdf},
  note         = {https://doi.org/10.18429/JACoW-COOL2021-S302},
  abstract     = {{The power system of the Stochastic Cooling System of the anti-proton decelerator AD at CERN, installed on top of the shielding blocks of the AD ring, was completely dismantled during the long shutdown 2 (LS2) at the end of the 2018 run in order to gain access to the accelerator for magnet consolidation. At start-up, this required finding and verifying the correct delays for all 48 power amplifiers feeding to the two kickers by means of beam transfer functions for the two cooling plateaus at 3.57 GeV/c and 2 GeV/c. We describe the methods used for the setting up and the results of the optimization for the cooling in all three planes, longitudinal, horizontal and vertical. An experimental set-up has been put into operation for the automatic monitoring and correction of the notch position of the longitudinal cooling at 3.57 GeV/c with optical delay lines. We also comment on the lessons learnt during the recommissioning including the repair work for a vacuum leak in the water cooling circuits of the kicker following bake-out and the verification of the internal loads by RF reflectometry.}},
}