Paper | Title | Other Keywords | Page | |||||
---|---|---|---|---|---|---|---|---|
THAP06 | Cooling in a Compound Bucket | antiproton, emittance, electron, injection | 171 | |||||
|
Funding: FNAL is operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. |
Presently antiprotons in Fermilabs Recycler ring are stored between rectangular RF barriers and are cooled both by a stochastic cooling system in full duty-cycle mode and by a DC electron beam. Electron cooling creates correlation between longitudinal and transverse tails of the antiproton distribution because particles with large transverse actions are cooled much more slowly than the core ones. Introducing additional RF barriers of lower amplitude allows separating spatially (along the bunch) the core and the tail. In this scenario, stochastic cooling can be gated to the tail, i.e. applied with a high gain to the low-density region and turned off for the core portion of the beam. This significantly increases the cooling rate of the tail particles, while the temperature of the core is preserved by electron cooling. In this paper, we will describe the procedure and first experimental results in detail. |
|
|||||
THAP10 | Status of Design Work Towards an Electron Cooler for HESR | electron, antiproton, gun, vacuum | 182 | |||||
|
Funding: Work supported by Uppsala University and by the European Union under FP6, Contract number 515873 - DIRAC Secondary Beams. |
The HESR-ring of the future FAIR-facility at GSI will include both electron cooling and stochastic cooling in order to achieve the demanding beam parameters required by the PANDA experiment. The high-energy electron cooler will cool antiprotons in the energy range 0.8 GeV to 8 GeV. The design is based on an electrostatic accelerator and shall not exclude a further upgrade to the full energy of HESR, 14.1 GeV. The beam is transported in a longitudinal magnetic field of 0.2 T and the requirement on the straightness of the magnetic field is as demanding as 10-5 radians rms at the interaction section. Furthermore, care must be taken in order to achieve an electron beam with sufficiently small coherent cyclotron motion and envelope scalloping. This puts demanding requirements on the electron beam diagnostics as well as the magnetic field measuring equipment. Prototype tests of certain components for these tasks are being performed. The paper will discuss these tests and recent development in the design including the high-voltage tank, electron gun and collector, magnet system, electron beam diagnostics and the magnetic field measuring system. |
|
Poster
|
|
|