Paper | Title | Other Keywords | Page | |||||
---|---|---|---|---|---|---|---|---|
MOA1I01 | Bunched Beam Stochastic Cooling at RHIC | proton, kicker, ion, pick-up | 25 | |||||
|
Stochastic cooling of ions in RHIC has been implemtneted to counteract Intra-Beam Scattering and prevent debunching during stores for luminosity production. The two main challenges in cooling bunched beam at 100 GeV/n are the coherent components in the Schottky spectra and producing the high voltage for the kicker in the 5 - 8 GHz band required for optimal cooling. The technical solutions to these challenges are described. Results of cooling proton beam in a test run and cooling gold ions in the FY07 production run are presented.
|
|
|
Slides
|
|
|