THCX  —  Parallel Working Session   (01-Jun-06   15:50—17:50)

Paper Title Page
THCX02 Cost Comparison of Linear and Circular Accelerators 356
 
  • A. G. Ruggiero
    BNL, Upton, Long Island, New York
 
  A simple comparison of construction cost between a Linear and a Circular Accelerator is made. Two simplified models are proposed and studied. The comparison is made with the two major magnet and RF cavity components. An approximated criterion is found according to which the Circular Accelerator is indeed the more economical of the two provided that the beam circulates a minimum number of turns.