Paper | Title | Page |
---|---|---|
THAY02 | Progress in slip stacking and barrier-RF | 293 |
|
||
Slip stacking for pbar production has been operational since December 2004 and increased the beam intensity on pbar target more than 60%. We plan to use slip stacking for NuMI neutrino experiment for effectively increasing intensity to NuMI target by about a factor two in a 2.2 sec MI cycle. In parallel with slip stacking, we plan to study fast momentum stacking using barrier buckets. One barrier rf system has been installed and tested, and second system is being installed during the current shutdown. |