The J-PARC accelerator complex consists of a 400-MeV linac, a 3.0-GeV rapid-cycling synchrotron (RCS), a 50-GeV main ring (MR) and associated beam transport lines to experimental facilities, which use the 3- and 50-GeV proton beams. It is now under construction in the Tokai campus of JAEA as a joint project between JAEA and KEK. The beam commissioning of each accelerator is scheduled to start for linac in December 2006, RCS in September 2007 and MR in May 2008. The commissioning strategy for the accelerator complex will be presented.
|
|