A   B   C   D   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   Y   Z    

Goddard, B.

Paper Title Page
TUAZ04 Safe disposal of the LHC beams by extraction onto the beam dumping blocks 0
 
  • B. Goddard
    CERN, Geneva
 
  The function of the LHC beam dumping system is to fast-extract the beam in a low-loss way from each ring of the collider and to transport it to an external absorber, positioned sufficiently far away to allow for appropriate beam dilution in order not to overheat the absorber material. Fast extraction will require a particle-free gap in the circulating beam, during which the field of the extraction kicker magnets can rise to its nominal value. Given the destructive power of the LHC beam, the dumping system must meet extremely high reliability criteria, which condition the overall and detailed design.  
WEAZ06 Transfer line damage during high intensity proton beam extraction from the SPS in 2004 228
 
  • B. Goddard, V. Kain, V. Mertens, J. A. Uythoven, J. Wenninger
    CERN, Geneva
 
  During extraction of a high intensity beam from the SPS in 2004 an incident occurred in which the vacuum chamber of a transfer line quadrupole magnet was badly damaged. The beam was a 450 GeV full LHC injection batch of 3.4·1013 p+ in 288 bunches, and was extracted with the wrong trajectory. The incident causes have been identified, with details reconstructed from the logged data and the damage to the vacuum chamber. The remedial measures which were taken are explained, and further recommendations made concerning the interlocking system performance and tests, as well as the operational procedures which must be adopted when commissioning with high intensities. The specific issues of how the incident happened, why the existing protection system was not sufficient and what can/has been done about it are addressed.