TUPMA022 Construction Progress of the SSRF Injector 133
 
  • D. M. Li, H. H. Li, Z. Q. Shen, M. H. Zhao, Z. Zhao
    SINAP, Shanghai
 
  SSRF (Shanghai Synchrotron Radiation Facility) is a 3rd generation synchrotron radiation source facility under construction. To meet the full energy top-up injection requirements of 3.5GeV storage ring, the injector of SSRF was designed which consists of a 150 MeV linac, a two super-periods 28 cells FODO type booster and two transfer lines (LT and HT). The cycle rate of booster is 1~2 Hz. SSRF was started building in the end of 2004, and the commissioning of accelerator part will be completed in April 2008 according to schedule. The Booster will start the commissioning until Oct 2007. Now most of on-line installing components, power supplies, and instruments are under manufacture or purchasing for SSRF booster. In this paper, the description of SSRF booster design, the progress of booster and transfer lines construction are described. Keywords: SSRF; booster; construction  
THZMA03 Construction of Shanghai Synchrotron Radiation Facility 593
 
  • Z. Zhao, H. Ding, H. Xu
    SINAP, Shanghai
 
  The Synchrotron Radiation Facility (SSRF), a third generation light source based on a 3.5GeV storage ring, is under construction at Zhang-Jiang Hi-Tech Park in Shanghai. The SSRF groundbreaking was made in December 2004 and the construction of the SSRF main and auxiliary buildings was completed in November 2006. The construction and installation of the SSRF accelerator components are under going with the target schedule of starting storage ring commissioning in April 2008 and the user operation in April 2009. This paper reports the construction progress of the Shanghai Synchrotron Radiation Facility.  
slides icon Slides