TUPMA022 Construction Progress of the SSRF Injector 133
 
  • D. M. Li, H. H. Li, Z. Q. Shen, M. H. Zhao, Z. Zhao
    SINAP, Shanghai
 
  SSRF (Shanghai Synchrotron Radiation Facility) is a 3rd generation synchrotron radiation source facility under construction. To meet the full energy top-up injection requirements of 3.5GeV storage ring, the injector of SSRF was designed which consists of a 150 MeV linac, a two super-periods 28 cells FODO type booster and two transfer lines (LT and HT). The cycle rate of booster is 1~2 Hz. SSRF was started building in the end of 2004, and the commissioning of accelerator part will be completed in April 2008 according to schedule. The Booster will start the commissioning until Oct 2007. Now most of on-line installing components, power supplies, and instruments are under manufacture or purchasing for SSRF booster. In this paper, the description of SSRF booster design, the progress of booster and transfer lines construction are described. Keywords: SSRF; booster; construction