Since the publication of the BCD (Baseline Configuration Document) in December 2005, the main target of the GDE (Global Design Effort) has benn the RDR (Reference Design Report), which contains the first estimation of the cost of the collider system. Through the three meetings at Bangalore in March 2005, at Vancouver in July, and at Valencia in Novemver, the first estimation has been completed and various efforts of cost reduction have been tried. The outline of the resulting design will be presented in the present talk together with the remaining design issues and required R&D items.
|
|