A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Wu, C. Y.

Paper Title Page
WEPMA096 Rejuvenation of Linac Control System for TLS 458
 
  • C. Y. Wu, J. Chen, K. T. Hsu, S. Y. Hsu, K. H. Hu, J.-Y. Hwang, C. H. Kuo, D. Lee, K.-K. Lin, C.-J. Wang
    NSRRC, Hsinchu
 
  The pre-injector control system is a turn-key system, which was deployed 15 years ago. It is complicated and out-of-date nowadays in terms of system integration and hardware upgrading. It must be modernized to ensure its performance and reliability, and most importantly, to facilitate system maintenance. Modernization involves upgrading to enhance functionality, to prevent obsolesce of out-of-date control modules, and to replace old parts. The purpose of the upgrade plan is to replace the pre-injector control system by a new unit which has the same control environment as that of the main control system of the NSRRC accelerator facilities. Thus, the control system maintenance, as a whole, will be made substantially easier than the original system.