A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Wang, C.-J.

Paper Title Page
WEPMA063 Diagnostic Supports for Top-Up Operation at TLS 410
 
  • K. H. Hu, J. Chen, K. T. Hsu, C. H. Kuo, C.-J. Wang
    NSRRC, Hsinchu
 
  Routine top-up operation of Taiwan Light Source (TLS) was started from October 2005. Various diagnostics tools are needed to support the top-up operation. These tools include diagnostics for injection efficiency, filling pattern, tune, instability, loss pattern measurement. Design consideration, details and future plans of these diagnostics will be summary in this report.  
WEPMA096 Rejuvenation of Linac Control System for TLS 458
 
  • C. Y. Wu, J. Chen, K. T. Hsu, S. Y. Hsu, K. H. Hu, J.-Y. Hwang, C. H. Kuo, D. Lee, K.-K. Lin, C.-J. Wang
    NSRRC, Hsinchu
 
  The pre-injector control system is a turn-key system, which was deployed 15 years ago. It is complicated and out-of-date nowadays in terms of system integration and hardware upgrading. It must be modernized to ensure its performance and reliability, and most importantly, to facilitate system maintenance. Modernization involves upgrading to enhance functionality, to prevent obsolesce of out-of-date control modules, and to replace old parts. The purpose of the upgrade plan is to replace the pre-injector control system by a new unit which has the same control environment as that of the main control system of the NSRRC accelerator facilities. Thus, the control system maintenance, as a whole, will be made substantially easier than the original system.