Paper | Title | Page |
---|---|---|
WEPMA010 | 8 GeV Beam Line Optics Optimization for the Rapid Antiproton Transfers at Fermilab | 345 |
|
||
Tevatron Run-II upgrade requires a significant increase of the efficiency and speed of the antiproton transfers from the Accumulator to the Recycler. This goal represents a great challenge as the time between stopping and initiating the stacking regime should change from 1 hour down to a few minutes. Here we discuss the beam line optics aspects of this project. Results of lattice measurements and optimization are analyzed in terms of transport efficiency and stability. |