TUPMA075 Status of the CTF3 Frequency Multiplication Rings 217
 
  • A. Ghigo, C. Biscari, F. Marcellini, M. Serio, A. Stella
    INFN/LNF, Frascati (Roma)
  • R. Corsini, S. Doebert, G. Geschonke, L. Rinolfi, F. Tecker, P. Urschütz
    CERN, Geneva
 
  The CLIC Test Facility (CTF3) is in construction at CERN by an international collaboration to demonstrate the feasibility of two beam acceleration scheme at the CLIC parameters. The drive beam of the CTF3 is composed by a fully loaded Linac that generates a long bunch train and two rings that provide the high current and bunch frequency multiplication by interleaving bunch trains. The status of the commissioning of the first ring (Delay Loop) and of the transfer lines are reported together with the installation of the second ring (Combiner Ring).