A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Shukla, S. K.

Paper Title Page
THPMA096 Installation and Integration of Indus-2 782
 
  • S. Chouksey, S. Kotaiah, S. S. Prabhu, V. Prasad, R. Ramasubramanian, S. K. Shukla, D. P. Yadav
    RRCAT, Indore (M. P.)
 
  The Synchrotron Radiation Sources consist of a large number of components of varying nature. Some components are light but highly delicate whereas some are big and heavy. However all components need a careful handling during their installation. Unit-cell mock-up assembly and virtual simulation of the installation process using software tools contributed significantly in visualizing various handling schemes, checking interferences and defining the assembly sequence. We have recently completed the installation and integration of 2.5 GeV Synchrotron Radiation Source, Indus-2, by adopting a set procedure of installation and pre-defined sequence. This paper presents, an overview of procedures, sequence of assembly, equipments and toolings used for material handling and safety precautions taken during the whole task of installation and assembly.