A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Park, S. S.

Paper Title Page
THPMA063 Energy Stabilization of 2.5 GeV Linac using DeQing 717
 
  • S. H. Kim, Y. J. Han, J. Y. Huang, S.-C. Kim, S. H. Nam, S. S. Park
    PAL, Pohang, Kyungbuk
 
  The 2.5 GeV electron linac of Pohang Accelerator Laboratory (PAL) employs 80 MW klystrons with matching 200 MW modulators as RF sources. Beam voltage stability of the klystron is directly related to a PFN (pulse forming network) charging voltage of the modulator. Therefore, a good regulation of a PFN charging voltage is essential in the modulator. The regulation of the klystron pulse voltage amplitude is made by controlling the PFN charging voltage. In a conventional resonant charging pulse modulator, the regulation is usually achieved by using a deQing circuit. The required beam voltage regulation of less than ± 0.5 %, without deQing circuit, has been achieved by using a SCR phase controller with a voltage regulator. For further improvement of the beam voltage stability for the PAL XFEL (x-ray free electron laser) linac, PAL is studying a deQing circuit aiming at the stabilization of less than 0.02%. A new deQing circuit has been developed with a compensation function which can reduce a charge voltage fluctuation by about several times. The design concept and performance of the deQing circuit will be discussed.  
THPMA074 Operational Analysis of Klystron-Modulator System for PLS 2.5-GeV Electron Linac 740
 
  • S. S. Park, J. Y. Huang, S. H. Kim, S.-C. Kim
    PAL, Pohang, Kyungbuk
 
  The klystron-modulator(K&M) system of the Pohang Accelerator Laboratory (PAL) generates high power microwaves for the acceleration of 2.5 GeV electron beams. There are 12 modules of K&M system to accelerate electron beams up to 2.5 GeV nominal beam energy. One module of the K&M system consists of the 200 MW modulator and an 80 MW S-band (2856 MHZ) klystron tube. The total accumulated high-voltage run-time of the oldest unit among the 12 K&M systems has reached nearly 92,300 hours as of June 2006. The overall system availability is well over 95%. In this paper, we review overall system performance of the high-power K&M system and the operational status of the klystrons and thyratron lifetimes, and overall system's availability will be analyzed for the period of 1994 to June 2006.