A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Naito, F.

 
Paper Title Page
MOXMA01 Present Status of J-PARC 1
 
  • F. Naito
    KEK, Ibaraki
 
  Japan Proton Accelerator Research Complex (J-PARC) is the high-intensity proton accelerator aiming to realize 1 MW class of the beam power. It is the joint project between High Energy Accelerator Research Organization (KEK) and Japan Atomic Energy Agency (JAEA). J-PARC consists of a 400MeV linac, a 3GeV Rapid Cycle Synchrotron (RCS) and a 50 GeV Main Ring (MR). At the present stage, the beam energy from the linac is 181 MeV and it will be extended to 400 MeV at the near future. Most components of the linac have been installed in the beam line, and the remaining preparation for the beam commissioning is underway. Since the beam commissioning of the linac will start in December 2006, the first result of the linac beam test will be reported at the conference. The beam commissioning for the RCS is scheduled in the middle of 2007. Finally that for the 50GeV synchrotron will be started at the beginning of 2009.  
slides icon Slides