MOOPMA04 Crab Cavity Development 36
 
  • Y. Morita, K. Akai, K. Ebihara, T. Furuya, K. Hara, T. Honma, K. Hosoyama, A. Kabe, Y. Kojima, S. Mitsunobu, H. Nakai, K. Nakanishi, M. Ono, Y. Yamamoto
    KEK, Ibaraki
  • T. Kanekiyo
    Hitachi Ltd., Hitachi Research Laboratory, Ibaraki-ken
  • K. Okubo, K. Sennyu
    MHI, Kobe
  • M. M. Rahman
    University of Chittagong, Chittagong
 
  Tow superconducting crab cavities, witch will be installed in the KEKB accelerator, is being assembled. The KEKB (KEK B-factory) is a double-ring, asymmetric-energy, high luminosity electron-positron colliding accelerator with a finite angle beam crossing. A purpose of the crab cavities is to deflect the beam-bunch with time-varying RF fields, and to provide the head-on collision at the interaction point (crab crossing scheme). The head-on collision will drastically increase luminosity. The crab cavity is required to have high RF fields (kick voltage) to provide beam-bunch deflection. This mode (crab mode, 509 MHz) is not the lowest order mode (LOM) of the cavity. In order to damp the LOM as well as the HOMs, a coaxial coupler is attached along the beam pipe. Two crab cavities have been fabricated and tested in a vertical cryostat. These cavities have already achieved the required kick voltage. One cavity was recently tested with high RF power in a cryomodule. After some conditioning, this cavity has achieved the required kick voltage. The test revealed some modifications were needed. After improvements, the cavity will be ready for installation.  
slides icon Slides
WEXMA01 Status of KEKB and Upgrade Plan to SuperKEKB 280
 
  • M. Yoshida, T. A. Agoh, K. Akai, M. Akemoto, A. Akiyama, A. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J. W. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, J. Haba, K. Hara, T. Higo, S. Hiramatsu, H. Hisamatsu, H. Honma, T. Honma, T. Ieiri, N. Iida, H. Ikeda, M. Ikeda, S. Inagaki, S. Isagawa, H. Ishii, A. Kabe, E. Kadokura, T. Kageyama, K. Kakihara, E. Kako, S. Kamada, T. Kamitani, K.-I. Kanazawa, H. Katagiri, S. Kato, T. Kawamoto, S. Kazakov, M. Kikuchi, E. Kikutani, H. Koiso, Y. Kojima, I. Komada, T. Kubo, K. Kudo, N. K. Kudo, K. Marutsuka, M. Masuzawa, S. Matsumoto, T. Matsumoto, S. Michizono, K. Mikawa, T. Mimashi, S. Mitsunobu, K. Mori, A. Morita, Y. Morita, H. Nakai, H. Nakajima, T. T. Nakamura, H. Nakanishi, K. Nakanishi, K. Nakao, H. Nakayama, S. Ninomiya, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, Y. Ohsawa, N. Ohuchi, K. Oide, M. Ono, T. Ozaki, K. Saito, H. Sakai, Y. Sakamoto, M. Sato, M. Satoh, K. Shibata, T. Shidara, M. Shirai, A. Shirakawa, T. Sueno, M. Suetake, Y. Suetsugu, R. Sugahara, T. Sugimura, T. Suwada, S. Takano, S. Takasaki, T. Takenaka, Y. Takeuchi, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, N. Yamamoto, Y. Yamamoto, Y. Yano, K. Yokoyama, Ma. Yoshida, S. I. Yoshimoto, K. Yoshino
    KEK, Ibaraki
 
  The KEKB is an electron-positron two-ring collider for the leading B meson factory. It consists of an 8 GeV electron ring (HER) and a 3.5 GeV positron ring (LER) and their injector linac. It has been operated since December 1998, and has recently marked the peak luminosity of 16.52 /nb/s. This peak luminosity is obtained under the crab-ready beam optics having the robust operating condition by some efforts to solve the optics problems. The integrated luminosity has also recently exceeded 1.2 /fb /day under the continuous injection mode. We are aiming more luminosity improvement after the crab cavity installation. Further the major upgrade plan for SuperKEKB is expected to achieve 400 /nb/s keeping the baseline of the original proposal and another upgrade plans are also considered towards over 1000 /nb/s based on the recent beam-beam simulation. This paper describes the recent status of KEKB and upgrade plans for SuperKEKB.  