A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Koseki, T.

Paper Title Page
TUPMA111 Present Status of J-PARC MR Synchrotron 259
 
  • T. Koseki, H. Kobayashi, H. Matsumoto, M. Yoshioka
    KEK, Ibaraki
 
  The Japan Proton Accelerator Research Complex (J-PARC) is a joint project of High Energy Accelerator Research Organization (KEK) and Japan Atomic Energy Agency (JAEA). The J-PARC accelerator complex is composed of a 400 MeV proton linac, a 3 GeV Rapid-Cycling Synchrotron (RCS), and a 50 GeV Proton Synchrotron (MR). Installation of the MR which has two extraction sections, fast extraction for the Neutrino Facility and slow extraction for the Hadron Facility, is now underway. Test of injection and extraction components such as septum magnets and kicker magnets is progressed as well. Beam commissioning scenario is now being prepared. Maintenance scenario of activated components is also crucial in a high power proton accelerator. Beam commissioning will start in May 2008.