A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Kobayashi, H.

Paper Title Page
TUPMA102 Installation and Radiation Maintanance Scenario for J-PARC 50 GeV Synchrotron 247
 
  • M. Yoshioka, T. Fujino, Y. Hori, K. Ishii, H. Kobayashi, T. Kubo, H. Matsumoto, H. Oki, T. Oogoe, Y. Saito, Y. Sato, M. Shimamoto, M. J. Shirakata, Y. Takeuchi, M. Uota, Y. Watanabe
    KEK, Ibaraki
  • M. HOSOKAWA
    THK CO., LTD, Hitachinaka
  • Y. Kuniyasu
    MELCO SC, Tsukuba
 
  Installation and assembling of accelerator components for J-PARC 50 GeV Synchrotron are now underway. Off-beam commissioning will be carried out between December 2007 and April 2008, and the full commissioning of J-PARC accelerator complex, which is consisted of an injector linac, a 3 GeV rapid cycling synchrotron and the 50 GeV Synchrotron, will be started from May 2008. This paper describes the status, schedule and method of installation and assembling of accelerator components. Radiation maintenance scenario will be also described.  
TUPMA111 Present Status of J-PARC MR Synchrotron 259
 
  • T. Koseki, H. Kobayashi, H. Matsumoto, M. Yoshioka
    KEK, Ibaraki
 
  The Japan Proton Accelerator Research Complex (J-PARC) is a joint project of High Energy Accelerator Research Organization (KEK) and Japan Atomic Energy Agency (JAEA). The J-PARC accelerator complex is composed of a 400 MeV proton linac, a 3 GeV Rapid-Cycling Synchrotron (RCS), and a 50 GeV Proton Synchrotron (MR). Installation of the MR which has two extraction sections, fast extraction for the Neutrino Facility and slow extraction for the Hadron Facility, is now underway. Test of injection and extraction components such as septum magnets and kicker magnets is progressed as well. Beam commissioning scenario is now being prepared. Maintenance scenario of activated components is also crucial in a high power proton accelerator. Beam commissioning will start in May 2008.