Author: Weitkaemper, H.     [Weitkämper, H.]
Paper Title Page
MOP047 Set up of Production Line for EXFEL Beam Position Monitor and Quadrupol Units for Cavity String Assembly at CEA 224
 
  • M. Schalwat, M. Koepke, A. Matheisen, H. Weitkämper
    DESY, Hamburg, Germany
 
  The super conducting (s.c.) accelerator models of the EXFEL consist of eight s.c. resonators, one s.c. quadrupol magnet and one beam position monitor. These components are connected inside ISO 4 cleanroom at CEA Saclay to a so called cavity string under the guidance of the XFEL WP 09 activities. The eight s.c. cavities are handed from DESY to CEA for string assembly after successful RF test. The beam- position monitor and Quadrupol units (BQU) are assembled and cleaned in the DESY cleanroom at DESY Hamburg to the same standard’s of cleanliness as requested for s.c. Cavities. The completed BQU units are handed over to CEA IRFU / WP 9 in “ready for installation to cavity string“ status. The setup of infrastructure, the qualification of processes and transport as well as the ramp up to a delivery rate of 1 BQU per week will be presented.