Paper | Title | Page |
---|---|---|
MOP018 | Design of the MYRRHA 17-600 MeV Superconducting Linac | 129 |
|
||
Funding: This work is being supported by the European Atomic Energy Community’s (EURATOM) Seventh Framework Programme under grant agreement n°269565 (MAX project). The goal of the MYRRHA project is to demonstrate the technical feasibility of transmutation in a 100MWth Accelerator Driven System (ADS) by building a new flexible irradiation complex in Mol (Belgium). The MYRRHA facility requires a 600 MeV accelerator delivering a maximum proton flux of 4 mA in continuous operation, with an additional requirement for exceptional reliability. This paper will briefly describe the beam dynamics design of the main superconducting linac section which covers the 17 to 600 MeV energy range and requires enhanced fault-tolerance capabilities. |
||
MOP081 | Preliminary Studies of the Cryogenic Refrigerator and Distribution Systems for the MYRRHA Proton Linac | 331 |
|
||
Funding: Work supported by the EU, FP7 MAX contract number 269565 In the framework of recent European programs (FP6-Eurotrans, FP7-MAX), the SC proton Linac for the MYRRHA project (associating an accelerator to a subcritical nuclear reactor, to be installed in the SCK•CEN at Mol-Belgium), has been extensively studied and optimized to reach strict requirements in beam power and reliability as needed for this ADS demonstrator. The linac, composed of 150 SC cavities (CH, spoke and elliptical) installed in 60 cryomodules, operates at 2K, delivering a beam power of 2.5 MW (600 MeV, 4 mA) in CW mode, will be installed in a tunnel of 240 m length. In this paper we present the evaluation of the cryogenic power requirements, a preliminary architecture of the cryogenic refrigerator system including all its major components, and preliminary proposals for the cryofluids distribution along the SC linac. |
||