Paper | Title | Page |
---|---|---|
TUP046 | Vertical Electropolishing of SRF Cavities and its Parameters Investigation | 514 |
|
||
Funding: We acknowledge the support of the European Community-Research Infrastructure Activity under the FP7 program (EuCARD, Contract No. 227579),and the support of the ‘‘Conseil General de l’Essonne’’(ASTRE) An advanced set-up for vertical electropolishing (VEP) of SRF niobium elliptical cavities is operating at CEA Saclay*. Cavities are VEP’ed with circulating standard HF-H2SO4 electrolyte. Parameters such as voltage, cathode shape, acid flow and temperature were investigated. Low-voltage (<7V), high acid flow (25L/min) and low acid temperature (20°C) are considered as promising parameters. Such recipe was tested on single-cell and 9-cell ILC cavities with nice surface finishing. After 60 μm VEP on a HEP'ed single-cell, the cavity show similar performance at 1.6K compared to previous Horizontal EP: (Eacc > 41MV/m) limited by quench. Another cavity reaches 36MV/m after 300μm removal by VEP in spite of a pitted surface due to initial VEP treatment at higher temperature (> 30°C). The baking effect after HEP/VEP is similar. An asymmetric niobium removal is observed with faster polishing in the upper cell. Nice surface finishing as well as standard Q0 value are obtained at low/medium field on 9Cell but achieved performance is limited by Field Emission. *F. Eozenou et al., PRST-AB, 15, 083501 (2012) |
||
THIOD03 | Cavity Development for the Linear IFMIF Prototype Accelerator | 878 |
|
||
The Linear IFMIF Prototype Accelerator (LIPAc), which is presently under design and realization, aims to accelerate a 125 mA deuteron beam up to 9 MeV. Therefore, a low-beta 175 MHz Half-Wave Resonator (HWR) was initially designed and manufactured with a tuning system based on a capacitive plunger located in the electric field region. Following the results of the vertical tests at 4.2K, this tuning system was abandoned and replaced by a conservative solution based on the HWR wall deformation using an external mechanical tuner. This paper will focus on the manufacturing of the prototype cavity, the studies realized to explain the first test results and the solutions taken to overcome the difficulties, leading to the validation of the prototype. Then, we will present the new cavity design. | ||
![]() |
Slides THIOD03 [8.845 MB] | |
FRIOC02 | ESS Elliptical Cavities and Cryomodules | 1218 |
|
||
The accelerator of the European Spallation Source (ESS) is a 5 MW proton linac to be built in Lund Sweden. Its superconducting section is composed of 3 cavity families: double spoke resonators, medium beta and high beta elliptical multicell cavities. This paper presents the electromagnetic and mechanical design of the 704.42 MHz elliptical cavities. Both elliptical famillies are housed in 4-cavity cryomodules which share a common design and set of components which will be described here. | ||
![]() |
Slides FRIOC02 [3.475 MB] | |
THIOA02 | The Challenge to Assemble 100 Cryomodules for the European E-XFEL | 816 |
|
||
As In-Kind contributor to the E-XFEL project, CEA is committed to the integration on the Saclay site of the 100 cryomodules (CM) of the superconducting linac as well as to the procurement of miscellaneous parts including 31 cold beam position monitors (BPM) of the re-entrant type. The assembly infrastructure has been renovated from the previous Saturne Synchrotron Laboratory facility: it includes a 200 m2 clean room complex with 112 m2 under ISO4, 1325 m2 of assembly platforms and 400 m2 of storage area. In parallel, CEA has conducted industrial studies and three cryomodule assembly prototyping both aiming at preparing the industrial file, the quality management system and the commissioning of the assembly plant, tooling and control equipment. In 2012, the contract of the integration has been awarded to ALSYOM. The first pre-series modules have been assembled and are being tested at DESY. This paper will present the challenges of the module integration from the preparation phase to the industrial phase. | ||
![]() |
Slides THIOA02 [17.641 MB] | |
THP056 | Validation Procedures for the IFMIF Power Coupler Prototypes | 1043 |
|
||
In the framework of the International Fusion Materials Irradiation Facility (IFMIF), which consists of two high power CW accelerator drivers, each delivering a 125 mA deuteron beam at 40 MeV, a Linear IFMIF Prototype Accelerator (LIPAc) is presently under design for the first phase of the project. The first two IFMIF Power Coupler Prototypes were manufactured for LIPAc. Series of acceptance tests have been performed successfully. Prototype Power Couplers have been then cleaned and assembled in an ISO 5 cleanroom. A dedicated test bench allowing RF conditioning of the couplers up to 200 kW CW at 175 MHz was achieved. RF power conditioning is planned to start during October 2013. | ||