Author: Rauch, A.P.
Paper Title Page
MOIOA01 The FRIB Project at MSU 1
 
  • M. Leitner, B. Bird, F. Casagrande, S. Chouhan, C. Compton, J.L. Crisp, K. Elliott, A. Facco, A.D. Fox, M. Hodek, M.J. Johnson, G. Kiupel, I.M. Malloch, D. Miller, S.J. Miller, D. Morris, D. Norton, R. Oweiss, J.P. Ozelis, J. Popielarski, L. Popielarski, A.P. Rauch, R.J. Rose, K. Saito, M. Shuptar, N.R. Usher, G.J. Velianoff, D.R. Victory, J. Wei, J. Whitaker, K. Witgen, T. Xu, Y. Xu, O. Yair, S. Zhao
    FRIB, East Lansing, Michigan, USA
 
  Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.
The Facility for Rare Isotope Beams (FRIB) is ready to start construction. The facility will utilize a high-intensity, heavy-ion driver linac to provide stable ion beams from protons to uranium up to energies of >200 MeV/u and at a beam power of up to 400 kW. The superconducting cw linac consists of 330 individual low-beta (β = 0.041, 0.085, 0.29, and 0.53 at 80.5 MHz and 322 MHz) cavities in 49 cryomodules operating at 2 K. This paper discusses the current development status of the project with emphasis on the linac SRF acquisition. SRF coldmass and cryomodule component designs are briefly summarized. A SRF production facility, currently under construction, is described.
 
slides icon Slides MOIOA01 [9.804 MB]  
 
MOP067 Results From Initial Tests of the 1st Production Prototype β=0.29 and β=0.53 HWR Cavities for FRIB 280
 
  • J.P. Ozelis, C. Compton, K. Elliott, M. Hodek, M. Leitner, I.M. Malloch, D. Miller, S.J. Miller, D. Norton, R. Oweiss, J. Popielarski, L. Popielarski, A.P. Rauch, K. Saito, G.J. Velianoff, D.R. Victory
    FRIB, East Lansing, USA
 
  Funding: Work supported by US DOE Cooperative Agreement DE-SC0000661 and Michigan State University
The first prototypes of the β=0.53 and β=0.29 HWR production design cavities for FRIB were fabricated early this year by Roark Manufacturing Company and delivered to MSU. These cavities have undergone an extensive evaluation program to verify both mechanical and RF performance before proceeding with fabrication of a pre-production run of 10 cavities. Results from physical inspections, warm RF measurements, chemical processing, and cryogenic vertical testing will be presented.