MOP081 | Preliminary Studies of the Cryogenic Refrigerator and Distribution Systems for the MYRRHA Proton Linac | 331 |
|
||
Funding: Work supported by the EU, FP7 MAX contract number 269565 In the framework of recent European programs (FP6-Eurotrans, FP7-MAX), the SC proton Linac for the MYRRHA project (associating an accelerator to a subcritical nuclear reactor, to be installed in the SCK•CEN at Mol-Belgium), has been extensively studied and optimized to reach strict requirements in beam power and reliability as needed for this ADS demonstrator. The linac, composed of 150 SC cavities (CH, spoke and elliptical) installed in 60 cryomodules, operates at 2K, delivering a beam power of 2.5 MW (600 MeV, 4 mA) in CW mode, will be installed in a tunnel of 240 m length. In this paper we present the evaluation of the cryogenic power requirements, a preliminary architecture of the cryogenic refrigerator system including all its major components, and preliminary proposals for the cryofluids distribution along the SC linac. |
||