Paper | Title | Page |
---|---|---|
TUP116 | Quench field and Location in Vertical Tests at KEK-STF | 751 |
|
||
Many vertical tests have been done for the ILC and ERL at KEK-STF since 2008. T-mapping system (fixed type) was equipped at every vertical test, and quench location was identified completely. Every quench location at quench field will be presented in this paper. | ||