Paper | Title | Page |
---|---|---|
THP056 | Validation Procedures for the IFMIF Power Coupler Prototypes | 1043 |
|
||
In the framework of the International Fusion Materials Irradiation Facility (IFMIF), which consists of two high power CW accelerator drivers, each delivering a 125 mA deuteron beam at 40 MeV, a Linear IFMIF Prototype Accelerator (LIPAc) is presently under design for the first phase of the project. The first two IFMIF Power Coupler Prototypes were manufactured for LIPAc. Series of acceptance tests have been performed successfully. Prototype Power Couplers have been then cleaned and assembled in an ISO 5 cleanroom. A dedicated test bench allowing RF conditioning of the couplers up to 200 kW CW at 175 MHz was achieved. RF power conditioning is planned to start during October 2013. | ||