MOP010 Spiral2 Cryomodules B Tests Results 95
 
  • G. Olry, F. Chatelet, C. Commeaux, N. Gandolfo, D. Grolet, C. Joly, J. Lesrel, D. Longuevergne, R. Martret, G. Michel, L. Renard, A. Stephen, P. Szott
    IPN, Orsay, France
  • P.-E. Bernaudin, R. Beunard, R. Ferdinand, A. Lefevre
    GANIL, Caen, France
  • Y. Gómez Martínez
    LPSC, Grenoble Cedex, France
 
  Assembly and tests of the SPIRAL2 superconducting linac's cryomodules at CEA/Saclay and IPN/Orsay have now reached cruising speed after having faced a series of problems, among them contamination. 19 cryomodules are composing the whole Linac and IPN Orsay is in charge of the 7 cryomodules B, housing two 88MHz, beta 0.12 Quarter-Wave Resonators. Two cryomodules have been successfully assembled and tested up to the nominal gradient of 6.5 MV/m for all cavities with also total cryogenic losses under specifications. One of them is fully qualified and has been already delivered to GANIL. The second one showed misalignment on one cavity which could lead to partial disassembly. This paper will present the results of those cryomodules tests as well as the status of the remaining ones.