A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Zheng, Q.

Paper Title Page
MOODAU05 ISAC-II: Status of the 20 MV Upgrade 81
 
  • R.E. Laxdal, R.J. Dawson, K. Fong, A. Grassellino, M.P. Laverty, M. Marchetto, A.K. Mitra, T.C. Ries, I. Sekachev, Q. Zheng, V. Zvyagintsev
    TRIUMF, Vancouver
  • R. Edinger
    PAVAC, Richmond, B.C.
 
 

The ISAC-II superconducting heavy ion linac, commissioned in 2006, consists of twenty quarter wave cavities housed in five cryomodules. An upgrade of the linac is ongoing that will see the addition of twenty more quarter wave cavities in three cryomodules by the end of 2009. The status of the upgrade will be reported.

 

slides icon

Slides

 

sound icon

Talk

 
THPPO054 Solid State Amplifiers for Linear Accelerators at TRIUMF 715
 
  • A.K. Mitra, K. Fong, R.E. Laxdal, J. Lu, R.W. Shanks, Q. Zheng, V. Zvyagintsev
    TRIUMF, Vancouver
 
 

Solid state amplifiers are being used for linear accelerators at TRIUMF which are either being upgraded or under development. The Radioactive Ion Beam (RIB) facility at ISAC II which is being upgraded with additional 20 quarter wave superconducting bulk niobium cavities will employ twenty 141 MHz solid state amplifiers. A 650 MHz solid state amplifier for electron gun development and an 1.3 GHz solid state amplifier for characterization of an elliptical superconducting niobium cavity are being used for the 50 MeV electron linac being planned at TRIUMF.