TUPPO002 IHEP 1.3 GHz SC RF Technology R&D Progress 168
 
  • J. Gao, S.Y. Chen, Y.L. Chi, J.P. Dai, J. Gu, M. Hou, K.X. Huang, T.M. Huang, S.P. Li, Z.Q. Li, Q. Ma, W.M. Pan, Y. Sun, Y. Sun, G.W. Wang, Z.X. Xu, J. Yu, J.Y. Zhai, J.R. Zhang
    IHEP Beijing, Beijing
  • R. Ge, C.H. Li
    IHEP Beiing, Beijing
 
 

IHEP has started the “1.3 GHz SCRF Accelerating Unit and Horizontal Test Stand Project” since early 2009. The SCRF Accelerating Unit contains a 9-cell 1.3 GHz superconducting cavity, a short cryomodule, a high power input coupler, a tuner, a low level RF system and a high power RF source, etc. This unit will also serve as a Horizontal Test Stand (HTS) for new components R&D. Recent progress of the components R&D is presented, as well as the key SCRF facilities design and commissioning, i.e. the CBP machine, pre-tuning machine and BCP facility for 9-cell cavities.

 