A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Peggs, S.

Paper Title Page
FROBAU02 The ESS SC Linear Accelerator 918
 
  • M. Lindroos, S. Peggs
    ESS-S, Lund
  • C. Oyon
    ESS Bilbao, Bilbao
 
 

In 2003 the joint European effort to design a European Spallation Source resulted in a set of reports. Two new proposed designs were presented at PAC09 by ESS-S and ESS-B. Both designs exploit synergies with projects such as SPL at CERN, eRHIC at BNL, and the EURISOL Design Study. Lund was agreed to be the ESS site in late May 2009. ESS-S then began to prepare for a coordinated European effort to update the design, and to prepare all legal and organisational matters that will be needed during the construction phase. The design update phase is expected to end in 2012. The present status of the preparatory work will be presented, together with an outline of future work. The baseline for the updated design will be presented and discussed. It delivers 5 MW of 2.5 GeV protons to a single target, in 2 ms long pulses with a 20 Hz repetition rate. Finally, potential future upgrades of power and intensity are considered, with the possibility of increasing the average beam power to as much as 7.5 MW, for delivery to one or perhaps two target stations.

 

slides icon

Slides

 

sound icon

Talk