Paper | Title | Page |
---|---|---|
TUPPO002 | IHEP 1.3 GHz SC RF Technology R&D Progress | 168 |
|
||
IHEP has started the “1.3 GHz SCRF Accelerating Unit and Horizontal Test Stand Project” since early 2009. The SCRF Accelerating Unit contains a 9-cell 1.3 GHz superconducting cavity, a short cryomodule, a high power input coupler, a tuner, a low level RF system and a high power RF source, etc. This unit will also serve as a Horizontal Test Stand (HTS) for new components R&D. Recent progress of the components R&D is presented, as well as the key SCRF facilities design and commissioning, i.e. the CBP machine, pre-tuning machine and BCP facility for 9-cell cavities. |
||
|