THPPO098 Assembly Preparations for the International ERL Cryomodule at Daresbury Laboratory 864
 
  • P.A. McIntosh, R. Bate, C.D. Beard, S.M. Pattalwar
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire
  • S.A. Belomestnykh, E.P. Chojnacki, Z.A. Conway, G.H. Hoffstaetter, P. Quigley, V. Veshcherevich
    CLASSE, Ithaca, New York
  • A. Büchner, F.G. Gabriel, P. Michel
    FZD, Dresden
  • M.A. Cordwell, D.M. Dykes, J. Strachan
    STFC/DL, Daresbury, Warrington, Cheshire
  • J.N. Corlett, D. Li, S.M. Lidia
    LBNL, Berkeley, California
  • T. Kimura, T.I. Smith
    Stanford University, Stanford, Califormia
  • S.R. Koscielniak, R.E. Laxdal
    TRIUMF, Vancouver
  • M. Liepe, H. Padamsee, J. Sears, V.D. Shemelin
    Cornell University, Ithaca, New York
  • D. Proch, J.K. Sekutowicz
    DESY, Hamburg
 
 

The collaborative development of an optimised cavity/cryomodule solution for application on ERL facilities has now progressed to final assembly and testing of the cavity string components and their subsequent cryomodule integration. This paper outlines the testing and verification processes for the various cryomodule sub-components and details the methodology utilised for final cavity string integration. The paper also highlights the modifications required to integrate this new cryomodule into the existing ALICE cryo-plant facility at Daresbury Laboratory.