Paper | Title | Page |
---|---|---|
TU6PFP090 | High-Intensity Demonstrations in the J-PARC 3-GeV RCS | 1504 |
|
||
The beam commissioning of the J-PARC 3-GeV RCS started in October 2007. The initial machine parameter tuning and underlying beam studies were completed in February 2008 through various beam dynamics measurements, such as optical functions, turn-by-turn beam positions, and transverse and logitudinal beam profiles. Now the RCS is in transition from the first commissioning phase to the next challenging stage and our efforts hereafter will be focused on higher beam power operations. In this paper, we describe experimental results obtained in the high intensity demonstrations in October 2008, together with the corresponding simulation results. |
||
TH5RFP061 | Study of J-PARC Linac Beam Position Monitor as Phase Monitor | 3591 |
|
||
In the J-PARC LINAC, BPMs with 4 strip lines (up, down, right, left) have been used to monitor the beam position by taking log ratio of signals on the opposite (facing) sides of stirp lines. We are studying possibility to monitor beam phase by measuring phase of summed signal of all four stlip lines. In this paper, status of the study is presented. |
||
TH5RFP096 | Study of Beam Loss Measurement in J-PARC Linac | 3678 |
|
||
Over hundred beam loss monitors (BLM) in the J-PARC LINAC have been used to measure the beam loss observed during the accelerator operation. Dose rates distributed in LINAC area were compared with beam loss records taken by the BLMs. This paper describes the results of the operational data and their comparisons with the dose rates of LINAC area. |