TU5PFP086 Status of RF Sources in Super-Conducting RF Test Facility (STF) at KEK 1032
 
  • S. Fukuda, M. Akemoto, H. Hayano, H. Honma, H. Katagiri, S. Kazakov, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, T. Miura, H. Nakajima, K. Nakao, T. Shidara, T. Takenaka, Y. Yano, M. Yoshida
    KEK, Ibaraki
 
 

The super-conducting RF test facility (STF) at KEK has been functional since 2005, and the STF phase-I, which involves the testing of a cryomodule with four superconducting cavities, was performed at the end of 2008. In this test, intense study of the power distribution system for the possible linear collider scheme was performed. Linear power distribution and tree-like distribution were compared and also the effects of eliminating circulator are studied. Current status of RF source of KEK STF are reported.

 
WE6PFP043 Recent Progress of KEKB 2588
 
  • Y. Funakoshi, T. Abe, K. Akai, Y. Cai, K. Ebihara, K. Egawa, A. Enomoto, J.W. Flanagan, H. Fukuma, K. Furukawa, T. Furuya, J. Haba, T. Ieiri, N. Iida, H. Ikeda, T. Kageyama, S. Kamada, T. Kamitani, S. Kato, M. Kikuchi, E. Kikutani, H. Koiso, M. Masuzawa, T. Mimashi, T. Miura, A. Morita, T.T. Nakamura, K. Nakanishi, M. Nishiwaki, Y. Ogawa, K. Ohmi, Y. Ohnishi, N. Ohuchi, K. Oide, M. Ono, Y. Seimiya, K. Shibata, M. Suetake, Y. Suetsugu, T. Sugimura, T. Suwada, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, Y. Yamamoto, Y. Yano, K. Yokoyama, M. Yoshida, S.I. Yoshimoto, D.M. Zhou
    KEK, Ibaraki
 
 

Crab cavities were installed at KEKB at the beginning of 2007. The beam operation with the crab cavities is in progress. In this paper, machine performance with crab crossing is described focusing on a specific luminosity and a beam lifetime issue related to the dynamic beam-beam effects.

 
WE6PFP110 Pulse-to-Pulse Switching Injection to Three Rings of Different Energies from a Single Electron Linac at KEK 2769
 
  • N. Iida, K. Furukawa, M. Ikeda, T. Kamitani, M. Kikuchi, E. Kikutani, Y. Kobayashi, T. Mimashi, T.M. Mitsuhashi, T. Miura, Y. Ogawa, Y. Ohnishi, S. Ohsawa, M. Satoh, M. Suetake, T. Suwada, M. Tawada, A. Ueda, Y. Yano, K. Yokoyama, M. Yoshida
    KEK, Ibaraki
 
 

The e+/e- injector LINAC in KEK usually successively injects into four rings, which are Low Energy Ring (LER) of KEKB (3.5GeV/e+), High Energy Ring (HER) of KEKB (8.0GeV/e-), Photon Factory (PF) (2.5GeV/e-) and Advanced Ring for pulse X-rays (PF-AR) (3.0GeV/e-). While LINAC continuously injects into LER and HER alternatively every about five minutes, keeping both of KEKB rings almost their full operating currents. It takes about one minute to switch beam mode of LINAC. PF and PF-AR are injected a few times in a day. Time for PF or PF-AR including mode-switch had taken about 20 minutes for each other. For PF injection, the switching time was shortened in 2005 and the occupancy time is about 5 minutes. In 2008, we succeeded to make the switching time shorter, 2 seconds for HER/LER, and Pulse-to-pulse alternatively injection for PF/HER using an event system. Especially for KEKB, the short switching time is contributed to provide high currents and to improve luminosity at which beam lives are too short to keep the high currents. In 2009, we have a plan to inject also for LER/HER pulse-to-pulse alternatively.