Paper | Title | Page |
---|---|---|
TH5RFP020 | Beam Emittance Measurements in RHIC | 3488 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. The proton polarization measurements in AGS and RHIC are based on proton-carbon and proton-proton elastic scattering in the Coulomb Nuclear Interference region. Polarimeter operation in the scanning mode gives polarization profiles and beam intensity profile measurements. This polarimeter is an ideal wire-scanner due to: extremely good signal/noise ratio and high counting rate, which allows accurate bunch by bunch emittance measurements during 100 ms time of the beam crossing. The measurements of the beam emittance in both vertical and horizontal planes will be possible after polarimeter upgrade for the 2009 polarized run. Two new vacuum chambers and two target motion mechanisms and detectors assembly will be installed in each ring. One polarimeter can be used for the vertical polarization and intensity profile measurements and the second can be used for the horizontal profile measurements. The absolute accuracy limitations and cross-calibration of different techniques will be also discussed. |
||
FR1GRC04 | AGS Polarized Proton Operation in Run 2009 | 4251 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. After installation of two partial snakes in the Brookhaven Alternating Gradient Synchrotron (AGS), a polarized proton beam with 1.5*1011 intensity and 65% polarization has been achieved. There are residual polarization losses due to horizontal resonances over the whole energy ramp and some polarization loss due to vertical intrinsic resonances. Many efforts have been put in to reduce the emittances coming into the AGS and to consequently reduce polarization loss. This paper presents the accelerator setup and preliminary results from run-9 operations. |
||
|