WE4GRC01 | Beam Diagnostics at the First Beam Commissioning of the J-PARC MR | 1964 |
|
||
Beam commissioning of the J-PARC MR has been going on from May 2008. The beam was one bunch of 4·1011 protons, nearly one hundredth of the design value. Here describe performances of the beam diagnostic devices: DCCT's, BPM's, BLM's, profile monitors and tune meters. Diagnostic design for the design intensity will be also included. |
||
|
||
WE5RFP023 | Status of UVSOR-II and Light Source Developments | 2318 |
|
||
UVSOR, a 750 MeV synchrotron light source of 53m circumference, had been operated for more than 20 years. After a major upgrade in 2003, this machine was renamed to UVSOR-II. The ring is now routinely operated with low emittance of 27 nm-rad and with four undulators. The test run of the top up injection has been started. The latest result will be reported. By utilizing a part of the existing FEL system and an ultra-short laser system, coherent synchrotron radiation and coherent harmonic generation have been extensively studied, under international collaborations. A new program on the coherent light source developments has been started, which includes upgrades of the undulator and the laser system and a construction of dedicated beam-lines. |