Paper | Title | Page |
---|---|---|
TU5RFP025 | A Full-Energy-Injector for the ANKA Storage Ring | 1147 |
|
||
The ANKA storage ring is filled at 0.5 GeV and then ramped to 2.5 GeV for regular user operation. A full-energy injection of the ANKA storage ring would have several advantages. The damping at a beam energy of 2.5 GeV is stronger, which will more efficiently fight instabilities during the injection, therefore allowing higher beam currents. With constant magnet settings, the orbit stability would improve significantly. The injection time would be reduced and topping- up operation would become possible. As a consequence, the optical elements of the user beamlines would see a constant power as a function of time which further enhances the overall stability. In this paper, a design for a full energy injector is proposed. The injector will be located inside the storage ring tunnel, similar to the SLS and ALBA design. The focusing is mainly provided by combined function magnets. The full energy injector has a design emittance of 40 nmrad and a circumference of 94.8 m. A modification of the existing storage ring is foreseen to house the necessary more powerful injection elements. |