A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Watanabe, Y.

Paper Title Page
TU6PFP090 High-Intensity Demonstrations in the J-PARC 3-GeV RCS 1504
 
  • H. Hotchi, N. Hayashi, Y. Hikichi, S. Hiroki, J. Kamiya, K. Kanazawa, M. Kawase, M. Kinsho, M. Nomura, N. Ogiwara, R. Saeki, P.K. Saha, A. Schnase, T. Shimada, Y. Shobuda, K. Suganuma, H. Suzuki, H. Takahashi, T. Takayanagi, O. Takeda, F. Tamura, N. Tani, T. Togashi, T. Ueno, M. Watanabe, Y. Watanabe, K. Yamamoto, M. Yamamoto, Y. Yamazaki, H. Yoshikawa, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • A. Ando
    LASTI, Hyogo
  • H. Harada
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
  • K. Hasegawa, Y. Irie, C. Ohmori, M. Yoshii
    KEK, Ibaraki
  • K. Satou, Y. Yamazaki
    J-PARC, KEK & JAEA, Ibaraki-ken
 
 

The beam commissioning of the J-PARC 3-GeV RCS started in October 2007. The initial machine parameter tuning and underlying beam studies were completed in February 2008 through various beam dynamics measurements, such as optical functions, turn-by-turn beam positions, and transverse and logitudinal beam profiles. Now the RCS is in transition from the first commissioning phase to the next challenging stage and our efforts hereafter will be focused on higher beam power operations. In this paper, we describe experimental results obtained in the high intensity demonstrations in October 2008, together with the corresponding simulation results.

 
TU5PFP028 High-Gradient RF Breakdown Studies with Narrow Waveguide 879
 
  • K. Yokoyama, S. Fukuda, Y. Higashi, T. Higo, N. Kudoh, S. Matsumoto, Y. Watanabe
    KEK, Ibaraki
 
 

High-gradient RF breakdown studies have been in progress at Nextef (New X-band Test Facility at KEK) since 2006. To study the characteristics of different materials on high-field RF breakdown, we have performed high-gradient experiments by using narrow waveguides that has a field of around 140 MV/m at 50 MW power. Breakdown rates of stainless-steel and copper cases were measured and the results are described in this paper.

 
MO3GRI01 Operating Experience with the RIKEN Radioactive Isotope Beam Factory 60
 
  • N. Fukunishi, T. Dantsuka, M. Fujimaki, A. Goto, H. Hasebe, Y. Higurashi, E. Ikezawa, T. Kageyama, O. Kamigaito, M. Kase, M. Kidera, M. Komiyama, H. Kuboki, K. Kumagai, T. Maie, M. Nagase, T. Nakagawa, J. Ohnishi, H. Okuno, N. Sakamoto, Y. Sato, K. Sekiguchi, K. Suda, H. Suzuki, M. Wakasugi, H. Watanabe, T. Watanabe, Y. Watanabe, K. Yamada, Y. Yano, S. Yokouchi
    RIKEN Nishina Center, Wako
 
 

The RIKEN RI Beam Factory (RIBF) is pushing the limits of energy for heavy ion cyclotrons. The first experiment of the RIBF has successfully finished with the discovery of new isotopes 125Pd and 126Pd* in June 2007 with a 345-MeV/nucleon uranium beam. However, the total transmission efficiency was limited to be less than 1%. In addition, a carry-over of oil was found in the refrigerator of the Superconducting Ring Cyclotron (SRC), which was the main accelerator of the RIBF. To solve these problems, we have improved beam monitors, upgraded the oil remover system of the compressor of the liquid helium cryogenic plant at SRC and made a series of acceleration tests. As a result, 0.3 pnA of a 345-MeV/nucleon uranium beam was stably delivered to RIBF users in November 2008 and a 345-MeV/nucleon 48Ca beam with the intensity of 170 pnA was obtained in December 2008. In the PAC09 presentation, we will summarize our operating experience with the SRC and developments of RIBF accelerators in addition to most up-to-date performance of the RIBF accelerator complex.


*T. Ohnishi et al., J. Phys. Soc. Jpn. 77 (2008) 083201

 

slides icon

Slides