Paper | Title | Page |
---|---|---|
TU4PBC04 | Production and Testing Results of Superconducting Cavities for ISAC-II High Beta Section | 786 |
|
||
The ISAC-II heavy ion linear accelerator has been in operation at TRIUMF since 2006. The high beta section of the accelerator, consisting of twenty cavities with optimum beta=0.11, is currently under production and is scheduled for completion in 2009. The cavities are superconducting bulk Niobium two-gap quarter-wave resonators with a frequency of 141 MHz, providing, as a design goal, a voltage gain of Veff=1.08 MV at 7 W power dissipation. Production of the cavities is with a Canadian company, PAVAC Industries of Richmond, B.C. after two prototype cavities were developed, produced and successfully tested. Cavity production details and test results will be presented and discussed. |
||
|